"Cost Estimation of the Entire Construction Process based on BAS Optimized CNN."

Na Li, Huan Wang (2025)

Details and statistics

DOI: 10.31449/INF.V49I29.8381

access: open

type: Journal Article

metadata version: 2025-09-13